Abstraction of quantities
During the estimation process in construction, estimators will carry undertake a process referred to as ‘taking off’. This refers to the process of identifying elements of construction works that can be measured and priced, and it is necessary to produce bills of quantities. Bills of quantities are issued to tenderers for them to prepare a price for carrying out the works described.
The elements can be measured in number, length, area, volume, weight or time.
Abstraction is the process of collating all the quantities ‘taken off’ into a single total for each element that can then be transferred into the bill of quantities.
Quantities of the same items are captured on dimension/abstraction sheets. For example, to capture of all quantities for facing brickwork, the estimator will start to measure the brickwork on drawings. They will generally measure the area of the wall and also capture the areas for windows and doors or any other features that will impact on the quantity of the facing brickwork area. As part of the abstraction, they will also round up figures. The estimator will then have a final quantity for all the facing brickwork that will be used in the bill of quantities.
The estimator will generally follow the ‘New rules of measurement’ as set out by the Royal Institute of Chartered Surveyors (RICS) to capture quantities for the abstraction. Depending on the project they will use one of the following standards:
- NRM1: Order of cost estimating and cost planning for capital building works.
- NRM2: Detailed measurement for building works.
- NRM3 - Order of cost estimating and cost planning for building maintenance works.
The rules of measurement will guide the estimator on the unit that has to be calculated for each element. For facing brickwork, the rules state that the unit applicable will be m2.
Typical units classified in the New rules of measurement are:
The rules will also guide the estimator on which areas of measurements to include and exclude during the abstraction of quantities.
[edit] Related articles on Designing Buildings Wiki
- Advantages of a bill of quantities.
- Approximate bill of quantities.
- Approximate quantities.
- Bill of quantities breakdown structures BQBS
- Bill of quantities software.
- Bill of quantities v Schedule of rates.
- Common mistakes in bill of quantities.
- How to take off construction works.
- New Rules of Measurement.
- Priced bill of quantities.
- Quantity.
- Standard Method of Measurement SMM7.
- Taking off construction works.
- Types of bill of quantities.
- Unpriced bill.
- Without quantities.
Featured articles and news
Delivering radical reform in the UK energy market
What are the benefits, barriers and underlying principles.
Information Management Initiative IMI
Building sector-transforming capabilities in emerging technologies.
Recent study of UK households reveals chilling home truths
Poor insulation, EPC knowledge and lack of understanding as to what retrofit might offer.
Embodied Carbon in the Built Environment
Overview, regulations, detail calculations and much more.
Why the construction sector must embrace workplace mental health support
Let’s talk; more importantly now, than ever.
Refurbishment for net zero; the BSRIA white paper
The everyday practice of tackling energy efficiency, fabric first, ventilation, air quality, and occupant wellbeing.
Sustainable construction design teams survey
Shaping the Future of Sustainable Design: Your Voice Matters.
Ensuring the trustworthiness of AI systems
A key growth area, including impacts for construction.
Foundations for the Future: A new model for social housing
To create a social housing pipeline, that reduces the need for continuous government funding.
Mutual Investment Models or MIMs
PPP or PFI, enhanced for public interest by the Welsh Government.
Stress Awareness Week ends but employer legal duties continue.
A call to follow the five Rs for the business and for the staff.
Key points and relevance to construction of meeting, due to reconvene.
Cladding remediation programmes, transparency and target date.
National Audit Office issue report on cladding remediation.
HBPT and BEAMS Jubilees. Book review.
Does the first Labour budget deliver for the built environment?
What does the UK Budget mean for electrical contractors?
Mixed response as business pays, are there silver linings?